Baku sleeper production plant

THOSTI personnel services:

  • Planning of entire works.
  • Coordination of entire purchasing.
  • Technical supervision during entire construction phase.
  • Suitability testing of raw materials.
  • Sleeper and concrete design.
  • Approval tests.
  • Works commissioning.
  • Personnel training.

Data

Project Trans-Caucasian Rail Link Project
Country Azerbaijan
Client ADDY
(Azerbaijan Railways Authority)
Year of construction 2002
Processing duration 18 months
Area ~ 12.000 m²
Product Track sleepers typ B70, Russian track gauge
Sleeper system THOSTI-BBRV (B70)
Capacity 270.000 track sleepers/year