Baku sleeper production plant
THOSTI personnel services:
- Planning of entire works.
- Coordination of entire purchasing.
- Technical supervision during entire construction phase.
- Suitability testing of raw materials.
- Sleeper and concrete design.
- Approval tests.
- Works commissioning.
- Personnel training.
Data
Project | Trans-Caucasian Rail Link Project |
---|---|
Country | Azerbaijan |
Client | ADDY (Azerbaijan Railways Authority) |
Year of construction | 2002 |
Processing duration | 18 months |
Area | ~ 12.000 m² |
Product | Track sleepers typ B70, Russian track gauge |
Sleeper system | THOSTI-BBRV (B70) |
Capacity | 270.000 track sleepers/year |