
Marcinelle sleeper production plant
THOSTI personnel services:
Technical supervision during entire construction phase.
Joint Venture with RMS (Railway Moulds & Systems Ltd. UK) for the manufacturer of 8-fold sleeper moulds for long-line production.
Data
Project | Marcinelle sleeper production plant |
---|---|
Country | Belgium |
Client | Dupuis Usines S.A. |
Year of construction | 2003 |
Processing duration | 6 months |
Product | Moulds |
Sleeper system | Longline |