Güsen sleeper production plant
THOSTI personnel services:
- Planning of entire works.
- Coordination of entire purchasing.
- Suitability testing of raw materials.
- Sleeper and concrete design.
- Approval tests.
- Technical supervision during entire construction phase.
- Works commissioning.
- Personnel training.
Data
Project | Güsen sleeper production plant |
---|---|
Country | Germany |
Client | Walter Bau AG |
Year of construction | 1991 |
Processing duration | 24 months |
Area | ~ 40.000 m² |
Product | Track sleepers type B70, B90, B58. Turnout sleepers. |
Sleeper system | THOSTI-BBRV (track sleeper) Long-lline (turnout) |
Capacity | 600.000 track sleeper/year 50.000 lin.m turnout sleeper/year |